CASES

Kunshan High-tech Zone Binhe Road (Jade Belt North Road - Nanxingdu Road) road project

The road project of Binhe Road (North Yudai Road - Nanxingdu Road) in Kunshan High-tech Zone was undertaken by Tianhe Construction Group Co., Ltd. The construction period is 300 days. The project is located in the south of Yudai North Road and the north of Nanxingdu Road in the high-tech zone. The maximum single span of the bridge is 10m, the rainwater pipe is 2418m, and the sewage pipe is 706m.