The second standard pile foundation and foundation pit support project of Block C of Mingjinyuan Phase 9, Kunshan

The second standard pile foundation and foundation pit support project of Block C of Mingjinyuan Phase 9, Kunshan, 8 single-unit 1 basement, the engineering piles use prestressed bamboo-section pipe piles and prefabricated uplift-resistant square piles, and the amount of pile foundation engineering is 5 10,000 meters. The foundation pit support adopts Φ850@1200 three-axis stirring + PRC-600 (130) B anti-bending pipe pile. The foundation pit support adopts Φ850@1200 three-axis stirring + PRC-600 (130) B anti-bending pipe pile. The main building project pile adopts T-PHC-B600-560 (120) bamboo section pipe pile. The foundation pit support adopts Φ850@1200 three-axis stirring + PRC-600 (130) B bending-resistant pipe pile, and the main building engineering pile adopts T-PHC-B600-560 (120) bamboo-section pipe pile.