CASES

The second standard pile foundation and foundation pit support project of Block C of Mingjinyuan Phase 9, Kunshan

The second standard pile foundation and foundation pit support project of Block C of Mingjinyuan Phase 9, Kunshan, 8 single-unit 1 basement, the engineering piles use prestressed bamboo-section pipe piles and prefabricated uplift-resistant square piles, and the amount of pile foundation engineering is 5 10,000 meters. The foundation pit support adopts Φ850@1200 three-axis stirring + PRC-600 (130) B anti-bending pipe pile. The foundation pit support adopts Φ850@1200 three-axis stirring + PRC-600 (130) B anti-bending pipe pile. The main building project pile adopts T-PHC-B600-560 (120) bamboo section pipe pile. The foundation pit support adopts Φ850@1200 three-axis stirring + PRC-600 (130) B bending-resistant pipe pile, and the main building engineering pile adopts T-PHC-B600-560 (120) bamboo-section pipe pile.

New construction of Jinxi Senior High School

The single foundation pit support of Kunshan Jinxi Senior High School Administration Building adopts No. 4 Larsen steel sheet pile + H-beam to pay. The single PHC-400(95)AB pipe pile of the teaching building of Jinxi High School. For the new construction of Jinxi Senior High School, the civil air defense foundation pit is supported by No. 4 Larsen steel sheet pile + 609 steel pipe. The new construction of Jinxi Senior High School uses 400 (95) AB and 500 (125) AB prestressed pipe piles for the pile foundation, with an engineering volume of 84,000 meters. The foundation pit support is supported by Larsen steel plate + H-beam and 609 steel pipe.
< 1 >