CASES
The Baoguo Temple Project in Qingpu District, Haishi is an antique building with a 2-story reinforced concrete frame structure. The double eaves roof and roof truss are made of wood. The project scale is 1000.81M2.
Yushan Shengjing is located in the core area of Yangcheng Lake Water Park. Yushan Shengjing Antique Villa Group has always been dubbed the reputation of "garden in garden, garden in garden". It belongs to a rare "rare diamond" level plot of water park. Building a private garden villa covers an area of 3.79 square kilometers and a water area of 1.2 square kilometers. It has successively won awards such as Kunshan Civilized Construction Site and Gusu Cup. Project scale: 54152.36m2. The winning bid price: 172.477188 million yuan. Construction unit: Kunshan Tianyuan Real Estate Co., Ltd.
Kunshan People's Hospital Medical Auxiliary Building Decoration Project Scale: 8716M2, winning bid price: 17 million yuan, construction unit: Kunshan First People's Hospital Due to the particularity of materials and processes used in the hospital, a model system should be established according to the characteristics of this project before large-scale construction, so as to find problems in time and reduce losses. Make a model for the main construction and special construction content, and incorporate the learning of the process model into the scope of workers' technical disclosure. The on-site physical disclosure allows the construction personnel to be more intuitive and more fully familiar with the construction process requirements and technical points.
The scale of the fine decoration project of the third bid section of the first phase of Yueshan near the lake in Suzhou: 48109.28M2, the winning bid price: 27.18 million yuan, the construction unit: Suzhou Golden Century Real Estate Development Co., Ltd. Centralized processing and fixed-length processing of wall and floor tiles: unified laying out, avoiding Deviation, the same type and layout, the same room and the same size, the factory centralized fixed-length processing. Engineering features: typesetting and on-site cutting losses are extremely low, and the utilization rate of residual materials is high. The use of mechanized material processing and paving is separated, which greatly improves the construction efficiency, saves time and cost, and is not restricted by the site. Cutting, drilling, chamfering, and angle grinding are precisely processed in the factory, and the quality is guaranteed. Reduce the cleaning and transportation of waste bricks generated by on-site cutting.
Kunshan Industrial and Commercial Bank
Huaqiao comprehensive office building decoration project (1F, 3F, 7~11F, 1~14F core tube) project, project scale: 10080M2, winning bid: 16.8424 million yuan, construction unit: Jiangsu Kunshan Rural Commercial Bank Co., Ltd. office The hall, reception hall, business hall, multi-function hall, honor exhibition hall and corridors have high requirements for decoration grades and many construction projects, especially the interior walls and ceilings have a strong sense of hierarchy and good aesthetics, reflecting the overall design effect. The decoration of each area should reflect the luxurious and concise modern office environment. Technological characteristics: A large number of wood grain metal plates are used, and the fire resistance is good. Pattern customization, high selectivity, beautiful and good anti-fouling performance. The material itself has good durability. The wall and top surface are made of wood grain metal plate veneer material, which is made by the factory and installed on site, which greatly improves the work efficiency. The quality and precision of mechanical production are guaranteed. Cut material according to the order to reduce material loss.
Road Project of Yudai North Road (Gusan Road-Binhe Road) in Kunshan High-tech Zone
The road project of Yudai North Road (Gusan Road-Binhe Road) in Kunshan High-tech Zone was undertaken by Tianhe Construction Group Co., Ltd. The construction period is 180 days. The project is located in the east of Jingcun Road and west of Dazhong Road in the High-tech Zone. The project cost is 12.245158 million yuan. The total length of the project is 764m and the road width is 24m. The road is 11m, the sidewalk on the south side is 3m, the green belt on the south side is 3.5m, and the green belt on the north side is 6.5m. m. A 39m simply supported girder bridge, 1449m rainwater pipeline and 143m sewage pipeline. The project has won the Kunshan Municipal Engineering Standardization Demonstration and Civilized Construction Site, the Kunshan Municipal Municipal Quality Project, and the Suzhou "Gusu Cup" Quality Engineering Award.
Kunshan High-tech Zone Binhe Road (Jade Belt North Road - Nanxingdu Road) road project
The road project of Binhe Road (North Yudai Road - Nanxingdu Road) in Kunshan High-tech Zone was undertaken by Tianhe Construction Group Co., Ltd. The construction period is 300 days. The project is located in the south of Yudai North Road and the north of Nanxingdu Road in the high-tech zone. The maximum single span of the bridge is 10m, the rainwater pipe is 2418m, and the sewage pipe is 706m.
Outdoor supporting project of block A of Mingjingyuan relocation community phase 9
The outdoor supporting project of Block A of Mingjingyuan Relocation Community Phase IX was undertaken by Tianhe Construction Group Co., Ltd. The construction period is 120 days. The project is located in Mingjing District A. The project cost is 8,464,572 yuan. The project scale is 6,800 m² of asphalt pavement, 3,700 m² of parking space, about 4,100 m² of 4m-wide roadway, 4,367m of rainwater pipes, 3,009m of sewage pipes, and a set of rainwater collection system. .
Nansong Road Reconstruction Project in Kunshan High-tech Zone
The reconstruction project of Nansong Road in Kunshan High-tech Zone (Yuanfeng Road-Yanjiang Road) was undertaken by Tianhe Construction Group Co., Ltd. The construction period is 190 days. The project is located in the south of Yuanfeng Road. The project cost is 13.048557 million yuan. The total length of the project scale road is 1274m, of which 824m is rebuilt, the road width is 44m, the new 450m, the road width is 20m, the rainwater pipeline is 1231m, and the sewage pipe is 452m.
Kunshan Zhangpu Sewage Treatment Plant Phase III Expansion Project
The third-phase expansion project of Kunshan Zhangpu Sewage Treatment Plant was undertaken by Tianhe Construction Group Co., Ltd. The construction period is 480 days. The project is located in the factory area of Zhangpu Sewage Treatment Plant, Jujin Road, Zhangpu Town, Kunshan City. The cost of the project is 48,113,275 yuan. The scale of the project is fine grille, aerated grit chamber, biological pool, secondary sedimentation tank, and secondary sedimentation. Tank distribution well and sludge pump room, intermediate lifting pump room, high-efficiency sedimentation tank, filter cloth filter, ultraviolet disinfection channel and contact tank, blower room, dosing and chlorination and carbon source adding room, concentration tank, new power distribution Room, water analysis room and PLC control room, communication room, water quality analysis center and canteen, and production facilities such as factory road drainage. Daily treatment of 25,000 tons of sewage. The project has won the Kunshan Municipal Engineering Standardization Demonstration Civilized Construction Site, the Suzhou Municipal Engineering Standardization Demonstration Civilized Construction Site, the Kunshan Municipal Quality Project, and the Suzhou "Gusu Cup" Quality Project Award.